How to specify different Head Tire Crane execution processes on a Dual Rail Transport Controller? Because there is an interference zone, as shown in the picture
![b7a342a7a5cbf04346d94384a0ef76cb|690x336](upload://9ya
test.vcmx(461.4 KB)

There is no direct way to implement this, as the task is assigned to the closest available crane. When the simulation starts, the task starting time is random.

However, in such a case, you can delay the other process, and that way affect which crane is assigned for each transport.

Actually, there probably is a setting in the Transport Link properties to choose which crane in the dual TC handles the transportation.

1 Like

Yes you can define it in the TransportLinks-Properties. You can choose between any crane or one of the cranes.

test_v2.vcmx(504.0 KB)


@Tilma @EsteThank you. It has been solved, but now I’m facing a new problem:
I have a special requirement here. I need to have three Overhead Tire Crane on a Dual Rail Transport Controller. I tried to modify the Dual Rail Transport Controller by adding CraneC, but I found a new problem. CraneC and CraneB may interfere with each other, as shown in the video. How should I modify the MainLogic script?

@Tilma @EsteThe previous issue has been resolved. Could you please check the new problem for me

I've done something similar before

@ease我是中国人,不知道怎么用英语描述。 我的邮箱是1091092141@qq.com,我会联系你。

I don’t know how to describe it in English because I am Chinese and my English is not very good.

@easeI am also Chinese. What is your email address? I will contact you

我的邮箱1091092141@qq.com